Cuplock Scaffolding System (EN 12811 / BS 1139)

Cuplock Scaffolding System (EN 12811 / BS 1139)

Cup-and-lock system scaffold for slab support, access and heavy-duty falsework
Send Inquiry
Chat Now
Description
Technical Parameters

Product Overview

Cuplock is a modular system scaffold built around a node: a bottom cup welded to the standard, a top cup that drops over the incoming ledgers and transoms, and a wedge driven home with a hammer. It is the fastest system to erect and strike for slab support and heavy falsework, which is why it dominates construction in the Middle East, Southeast Asia and much of Africa.

What makes or breaks a Cuplock supply is the node. The cups must be welded square and at the right spacing, the wedge must lock without bottoming out, and the tube must be straight enough that the standard stacks plumb. A cheap set with misaligned cups cannot be assembled square, and no amount of bracing fixes it.

We supply complete Cuplock systems - standards, ledgers, transoms, base jacks, U-heads, diagonal braces and accessories - in Q235 or Q345, hot dip galvanized to a coating that survives site use.

Key Advantages

  • Node accuracy. Cups welded square and at fixed spacing, so standards stack plumb and ledgers sit level.
  • Speed. One hammer per joint - the fastest system to erect and dismantle, which is the whole commercial reason for Cuplock.
  • Load capacity. Heavy-duty falsework capacity without the tube-and-clamp density.
  • Galvanized durability. Hot dip coating on tubes and cups; site damage does not start a rust line at every joint.
  • Complete system. Standards, ledgers, transoms, jacks, U-heads and braces from one source, so dimensions match.

Technical Specifications

ComponentTypical sizeMaterial / finish
Standard (vertical)1.0 / 1.5 / 2.0 / 2.5 / 3.0 m, 48.3 × 3.2 mmQ235 / Q345, HDG
Ledger (horizontal)0.9 / 1.2 / 1.5 / 1.8 mQ235, HDG
Transom0.9 / 1.2 / 1.5 mQ235, HDG
Base jack0.6 m screw, 150 × 150 mm plateQ235, HDG
U-head jack0.6 m screw, 100 mm forkQ235, HDG
Diagonal brace1.5 / 1.8 / 2.0 mQ235, HDG
StandardEN 12811 / BS 1139-

Step-by-Step Manufacturing Process

  1. Tube production. ERW tube rolled to 48.3 mm and wall thickness, straightened and cut.
  2. Cup forming and welding. Bottom and top cups pressed, then welded at fixed spacing with a jig - the step that decides system accuracy.
  3. End preparation. Spigots and sockets formed so standards stack and lock.
  4. Galvanizing. Hot dip galvanizing after fabrication, with coating thickness checked.
  5. Assembly test. Sample components assembled to confirm the wedge locks and the node sits square.
  6. Packing. Bundled by component type, marked for site identification.

Quality Assurance & Certificates

  • Material certificate for tube and plate
  • Weld inspection at the cup-to-standard joint, which carries the load
  • Galvanizing thickness report
  • Dimensional check on cup spacing, tube straightness and spigot fit
  • Load test report on request, for projects that require it

Core Applications

  • Slab and beam falsework - the main use of Cuplock
  • Access scaffolds on facades and industrial plant
  • Heavy-duty shoring in refineries and power stations during maintenance
  • Bridges and viaducts where falsework must carry concentrated load
  • Event and temporary structures

FAQ

Cuplock or tube and clamp?

Cuplock for rectangular falsework and repetitive access - it is faster and more predictable. Tube and clamp stays useful for irregular geometry and for tie-ins where no node lines up.

Can I buy components separately?

Yes, but order the system together where possible: mixed-source cups and ledgers are where fit problems appear on site.

What galvanizing thickness?

Standard hot dip coating for scaffolding service; specify a coating weight if the project has a corrosion class requirement.

Frequently asked questions

What does the Cuplock Scaffolding System specification cover?

Component: Typical size; Standard (vertical): 1.0 / 1.5 / 2.0 / 2.5 / 3.0 m, 48.3 × 3.2 mm; Ledger (horizontal): 0.9 / 1.2 / 1.5 / 1.8 m.

Where is Cuplock Scaffolding System used?

Slab and beam falsework - the main use of Cuplock; Access scaffolds on facades and industrial plant; Heavy-duty shoring in refineries and power stations during maintenance.

What documentation is supplied with Cuplock Scaffolding System?

Material certificate for tube and plate; Weld inspection at the cup-to-standard joint, which carries the load.

Send Message